Planning rules: Tell the planner how you work
Indoor jobs belong in the morning. Ladder jobs go to Ole or Per. One particular customer must never be planned automatically. With Planning rules you write this kind of thing down once, and Clientflow follows the rules every time the week is planned.
What is a planning rule?
A planning rule has two parts:
- When: which orders the rule applies to. For example orders with the service Interior window cleaning.
- Then: what planning must do with them. For example be planned at 08:00–10:00.
Clientflow writes each rule as a sentence you can read out loud: "orders with Interior window cleaning must be planned at 08:00–10:00".
Every rule has a Strength: Must or Prefer.
- Must is always followed. The planner does not weigh the rule against driving or how busy the day is, and if an order cannot follow it, the order stays unplanned.
- Prefer is followed when it can be, and gives way otherwise. An order is never left unplanned just because a Prefer rule could not be followed.
If you are unsure, pick Must. It is what a new rule starts with. Read more under Must or Prefer further down.
Where do I find the rules?
Go to Settings → Planning and find the Planning rules block. It sits just below Rules.
At the top you see how many rules you have. Below that come:
- Always applies before the rules: three fixed rows, explained further down
- your own rules, numbered from the top (#1, #2 …)
- Test an order, once you have at least one rule
The rules are shared by all units by default, and the Unit condition lets a shared rule apply to one unit. If you have several units, you can pick a unit at the top of the page and press Own rules for this unit. That copies the shared rules to the unit, so you can change them without changing the other units. From then on the planner follows only the unit's own rules for that unit, not the shared ones. Use the shared rules again deletes the unit's own rules, and the unit is planned with the shared rules from the next planning run. The unit's other planning settings are described in Units.
How to create a rule
Step 1: Start from an example, or from scratch
If you have no rules yet, the block shows No planning rules yet and three examples you can start from:
| Example | What it sets up |
|---|---|
| Indoor jobs at 08–10 | A condition on the service and the time window 08:00–10:00 |
| Ladder jobs to those with the Ladder competence | A condition on the ladder icon and the effect Must have competence |
| First visit to a specific worker | The condition First visit and the effect Only these workers |
An example only opens the rule, filled in. Nothing is saved until you press Save yourself, so you can adjust it first.
To start from scratch, press New rule.
Step 2: Choose when the rule applies
Under When, press Add condition. Each condition has an is or is not, so you can choose both orders with the service X and orders without the service X.
| Condition | What it looks at |
|---|---|
| Service | The services on the order |
| Service group | The group the order's services belong to |
| Icon | The icons on the order's services, such as a ladder |
| Competence | The Competences the order requires |
| Requires presence | Whether the customer has to be home |
| Customer | One or more specific customers |
| Specific subscription | One particular subscription of a customer |
| Customer group | The customer's group |
| Customer tag | The customer's tags |
| Customer type | Business or Private |
| Worker at last visit | Who did the latest completed visit on the same subscription. If there is none, it looks at the customer's latest completed visit |
| First visit | Whether it is the customer's first visit |
| Unit | The unit the order belongs to |
| Subscription | Subscription type (Recurring, On demand or No subscription) and optionally Scheduling (optional) (Every N weeks, Every N months or Within a window) |
With several conditions, all of them must hold before the rule applies. With none, the rule applies to every order.
To pick a Specific subscription, first choose one customer in a Customer is condition. The customer's subscriptions then show up.
Step 3: Choose what should happen
Under Then, pick one effect:
| Effect | What the planner does |
|---|---|
| Time window | Places the order within the time span you choose. You can add more with Add time window. |
| Weekdays | Places the order on the weekdays you switch on. |
| Only these workers | Gives the order to one of the workers on the list. |
| Never these workers | Never gives the order to the workers on the list. |
| First listed worker who works | Each day, gives the order to the first person on the list who is working and can take it. Otherwise the next one. |
| Must have competence | Gives the order to someone who has the Competence. |
| Must not have competence | Never gives the order to someone who has the Competence. |
| Same worker as last visit | Gives the order to the worker who did the latest completed visit on the same subscription, or otherwise the customer's latest completed visit. With no earlier visit, the rule gives way. |
| Do not plan automatically | Leaves the order alone. It stays where it is and planning does not move it. |
A rule does one thing. To control both the time and the worker, make two rules. When several rules apply to the same order, the planner follows all of them.
Step 4: Choose the strength
Below the effect you find Strength. Pick Must (the rule is always followed) or Prefer (the rule is followed when it can be, and gives way otherwise). A rule set to Prefer is written as "It is preferred that …".
Strength is not shown for the effect Do not plan automatically. It is always a Must rule.
Step 5: Name the rule and save
The Name (optional) field is for you, for example Interior window cleaning in the morning. Press Save. The rule is added at the bottom of the list.
You can have up to 200 rules.
The order decides
When two rules say different things about the same order, the one higher up wins. That holds for two rules of the same strength. A Must rule always comes before a Prefer rule, wherever they stand in the list. Move a rule up or down with the arrows, then press Save changes at the bottom of the page.
You can switch a rule off without deleting it. It then shows the Off badge, and the planner ignores it.
When two rules clash
When two rules can hit the same order and cannot both hold, the list shows a line under both rules. For example: Overlaps with #2 for orders with Interior window cleaning, #1 wins.
That is not an error. It just tells you which rule wins. If it is the wrong one, swap their order.
If one rule is Must and the other Prefer, the line says something like: Must rule #2 takes precedence over Prefer rule #1 for orders with Interior window cleaning. Here the strength decides, not the order.
Rules about different things never clash. A rule about time and a rule about workers both apply. But if together they leave no option, the order ends up under Unassigned orders.
What applies before the rules?
At the top of the block is Always applies before the rules, with three rows marked Fixed. They always sit above your own rules:
| What it means | |
|---|---|
| Locked orders | A locked order stays where it is. No rule moves it. The lock keeps what it locks: always the day, and depending on the lock also the worker and the time. What the lock does not keep, a rule can still decide. An order that is Locked to day still follows a rule about workers, for example. Do not plan automatically always gives way to a lock: a locked order is still planned. |
| The customer's own rules | Times and workers set on the customer or the subscription come before all rules. |
| Competence requirements | The Competences a service requires always apply. See Competences. |
When a rule wants something one of these three does not allow, the rule gives way on that order. Every other order the rule applies to still follows it.
When something in the rule is deleted
If you delete something a rule names, such as a worker or a customer, the rule shows the text Names something that has been deleted. That part no longer applies. Fix the rule or delete it.
If a rule about workers or Competences only points to workers who have been removed, or to Competences that have been archived, it gives way. It never means "everyone".
Must or Prefer
| Must | Prefer | |
|---|---|---|
| Followed | Always | When it can be |
| Cannot be followed | The order stays unplanned under Unassigned orders | The rule gives way and the order is planned anyway |
| Against another rule | Comes before a Prefer rule | Gives way to a Must rule |
| When you move an order yourself | You get a warning if it breaks the rule | No warning |
Use Must for what must not go wrong, such as a ladder job only going to someone with the Ladder Competence. Use Prefer for what you would like, but can live without, such as a customer usually getting the same worker as last time.
A Prefer rule stays within what the Must rules allow. If a Must rule says the order can only go to Ole or Per, and a Prefer rule says it should go to Pia, the Prefer rule gives way for that order.
Prefer is available for every effect except Do not plan automatically.
How to see whether a Prefer rule was followed
- In the list, a Prefer rule carries the badge Prefer.
- Under the rule you see how the latest planning went: Followed in the planning of a date with a figure like 8 of 10, Gave way in the planning of a date, or No planning run yet.
- In Test an order the rule shows as Prefer: … under Outcome, with the note Prefer is followed when it can be, and may give way when planning.
If a rule often shows as Gave way, a Must rule, a lock or the customer's own times are usually in the way. Test an order shows which.
Test an order
Below the list you find Test an order. Search by order number or customer and pick the order. You then see every rule with a status:
| Status | Means |
|---|---|
| Applies | The rule applies to the order, and the planner follows it. |
| Does not apply | The order does not match the rule's conditions. |
| Gives way | The rule matches, but is not followed for this order. The reason shows under the rule, for example Gives way to rule 1, Gives way to the order's lock, that there is no earlier visit, that what the rule points to has been removed, or that the order's details are missing. |
| Cannot be judged | The rule uses something this version of the app does not know. The planner skips it. |
Under Outcome you see what the planner does, for example Planned at 08:00–10:00 or Not planned automatically. A Prefer rule shows as Prefer: … with a note that it can give way. If no rule changes anything, it says No rule changes how this order is planned.
The test uses the same rules as the planner, so what you see is what happens. Press Pick another to test a different order.
On the order itself
When you open an order, you also find the Planning rules section. It stays folded until you open it, and shows only the rules that apply to the order or give way on it, plus the outcome. The office sees the section once you have at least one rule switched on.
Who takes the jobs when a worker is away?
When a worker is ill or on holiday, you can make a rule for it straight from Unassigned orders in the calendar. Press the Who takes the jobs when a worker is away? button and pick the worker.
A new rule then opens, filled in with the condition Worker at last visit is that worker and the effect First listed worker who works, with the worker themselves at the top of the list. That way the worker keeps their customers whenever they are at work. Add the people who should take over below them, in the order they should be asked, and press Save.
When an order is not planned
An order that a rule keeps out of the plan ends up under Unassigned orders with the reason Do not plan automatically. The description names the rule, for example The order is not planned automatically because of planning rule #3 (First visit).
That happens when:
- a rule says Do not plan automatically, and the order does not have a place yet
- a rule only allows certain workers, and none of them are working
- the rules together leave no time or no worker
If the order already has a place when a Do not plan automatically rule applies, it stays with the same worker at the same time.
You can always drag the order into the calendar yourself. To find out why, use Test an order.
When you move an order yourself
You can always move an order, even if it breaks a rule. The order is moved, but you get a yellow warning: Breaks a planning rule. It names the rule and says the next planning may move the order again.
If the worker is also missing a Competence, you get one combined warning: Missing Competence and breaks planning rules.
The warning only covers Must rules. If you move an order so that it breaks only a Prefer rule, you get no warning.
When does the planner use the rules?
| Planning | Follows the rules? |
|---|---|
| Planning the week and planning a day | Yes |
| Nightly optimization | Yes |
| Live replanning (Automatically adjust the rest of the day) | No. It rescues a day that is already under way. |
| The customer's own online booking | No. The rules do not limit which times the customer can choose. When the visits are planned again later, they follow the rules. |
Split orders
You can split a big job into several parts with Split order, for example a 24-hour job into three parts. At first the parts stay where the order was, back to back. When the week is planned again, the planner tries by default to keep the parts close together. If it cannot, the parts can end up spread over several days.
With Keep parts together you decide how close together Clientflow keeps the parts, and with Strength whether that is a Must or a Prefer.
Where do I find the setting?
Go to Settings → Planning and find the Split orders block. It sits just below Planning rules. Pick one of the four choices under Keep parts together, and press Save changes at the bottom of the page.
| Choice | What the planner does |
|---|---|
| Off | Places the parts independently. |
| Same day | Plans every part on the same day, with several workers if needed. |
| Consecutive days | Plans the parts on working days in a row. A day when none of your workers work, such as a weekend or a closed public holiday, does not break the run. |
| As close as possible | Plans the parts as close together as possible, with no fixed rule about the days. A day in between is fine. |
The default is As close as possible with Prefer. If you have saved another choice yourself, you keep it.
The choice applies to every split order. When it is not Off, Strength shows below it:
| Strength | What it means |
|---|---|
| Prefer | The planner keeps the parts together when it can. If it cannot, it plans the parts separately rather than leave them unplanned. |
| Must | The setting always applies. The planner would rather leave the parts unplanned than spread them out. |
When Keep parts together is on, the Split order window says so too, for example Keep parts together: Same day. Locked parts stay where they are.
What the planner does not move
Some parts always stay where they are. The planner gathers the other parts around them:
- Locked parts. If you split a locked order, every part is locked. The planner then moves none of them. Unlock the parts if the planner should keep them together.
- Parts the customer has been notified about. The time the customer was given holds.
- Parts outside what is being planned, such as a part in another week.
- Completed parts, with Consecutive days and As close as possible. With Same day the planner ignores them and puts the rest on one day.
If two locked parts already sit on days that do not fit the choice, for example Monday and Thursday with Same day, the planner gives way to the locks. The other parts are then planned from the first to the last of those days, as far as their own times allow.
Planning rules, the customer's own times and Competences still apply. The planner only picks days where each part is allowed to go under them. If the customer's own times leave no days that keep the parts together, the planner leaves Keep parts together aside for that order and plans the parts separately.
When the parts cannot be kept together
With Prefer this does not happen because of the setting: if the parts cannot be kept together, they are planned separately. What follows applies when Strength is Must.
If the planner cannot fit every part the way you chose, it plans none of the other parts. Parts it may not move stay where they are. The part that could not be planned is under Unassigned orders with its own reason, for example Capacity. The other parts are there with one of two reasons:
| Reason | What it means |
|---|---|
| Keep parts together | One part could not be planned, or the parts could not be placed the way you chose. The description names the part and why, for example Split order: part 2 could not be planned (Capacity), so none of the 3 parts is planned (Must: on the same day). |
| Too few worker-days | There are not enough worker-days that can take the parts the way you chose, even with no other jobs that week. Working hours, Competences and the customer's times all count. The description says how many, for example Split order: only 1 of 2 worker-days can take the parts on the same day (Must). |
You can always drag the parts into the calendar yourself. Or pick a looser choice, such as As close as possible instead of Same day.
When you turn Keep parts together on, the next planning may move parts that are spread out today. With Must it may also take them off the plan if they cannot be kept together. Parts it may not move stay where they are.
When you move a part yourself
You can always move a part. If the parts are then no longer together under Same day or Consecutive days, you get a yellow warning: Parts are not together. The warning comes when the part gets a new day. If the move also breaks a planning rule or misses a Competence, you get one combined warning under that title, for example Breaks a planning rule, with the sentence about the parts added to it. The part is moved anyway, but the next planning may move it again.
When does the planner keep the parts together?
When the week or a day is planned, and in the nightly optimization. Live replanning (Automatically adjust the rest of the day) does not keep the parts together.
Automatic splitting
Some orders are too big for any worker to finish in one day. Without splitting, such an order stays under Unassigned orders until you split it yourself with Split order. With Automatic splitting the planner can split it for you. The order then becomes a split order, and the parts can land on different days.
It is off by default. You switch it on, and you decide how short the parts may be and how many there may be.
Which plan: Professional and Enterprise. It belongs to Planning rules.
How to switch it on
- Go to Settings → Planning and find the Split orders block. The Automatic splitting card sits below Keep parts together.
- Switch on Split large orders automatically.
- Pick Shortest part (minutes) and Most parts.
- Press Save changes at the bottom of the page.
| Setting | What it does | Possible values |
|---|---|---|
| Split large orders automatically | Lets the planner split orders that are too big for one piece. Off by default. | On or off |
| Shortest part (minutes) | How short a part may be. An order shorter than twice this is never split. | 15 to 480. Default is 120. |
| Most parts | The largest number of parts the planner splits one order into. | 2 to 12. Default is 6. |
If you have several units, the setting applies to the unit or company you picked at the top of the page. For a unit that follows the company's settings, the card is locked, and you change it on the company.
When does the planner split an order?
Only when no single worker-day can hold the order in one piece. An order is not split just because the week is busy. If the order fits in a day, the planner leaves it alone.
The planner does not split, for example:
- orders that are locked, in progress or completed
- orders that are already split, whether you or the planner split them
- orders with an invoice document on hold
- orders where the customer has been notified but the order has no promised day
- orders where the customer must be home for every part and no single day can hold the whole order
- orders where you have undone an automatic split. See If you change your mind below.
When does it run?
When a whole week is planned, with Replan or in the nightly optimization. It does not run when you re-plan a single day, for example with Replan this day, and not in live replanning (Automatically adjust the rest of the day). If a large order is left unplanned in the middle of the week, it is therefore not split until the next week or night planning.
Trial run and Active
Below the switch there is a status line as long as it is switched on and saved. It tells you what happened in the last run:
| Status | What it means |
|---|---|
| No run yet. | The planner has not run since you switched it on. |
| Trial run | The planner has only calculated it. The line says how many orders would have been split, for example At the last run 2 orders would have been split. Nothing has been split yet, and the orders are still under Unassigned orders with their usual reason. |
| Active | The planner splits orders. The line says how many it split in the last run, for example The last run split 2 orders. If some splits were refused, that is shown too. |
The card can also say that no orders were too big, or that a unit was not part of the last run. Switching between Trial run and Active is not a setting you can change on the card.
What you see on the orders
- The parts carry the badge Part 2 of 3 · Split automatically with the date. On the small cards it reads 2/3 and Auto.
- If the office has changed a part, it reads Split automatically, edited by the office. The split is then manual and the planner does not change it again. Moving or locking a part does not count as a change.
- If an order cannot be split within the limits, or there is no room, it sits under Unassigned orders with a new reason. They only appear when Active is shown on the card. See the table under If something goes wrong.
If you change your mind
You can always merge an automatically split order back with Merge back, or remove a part with Remove part. When you do, the planner does not split the order automatically again until you allow it.
To allow it, open the order and press Allow automatic splitting again. The button sits at the bottom of the window, next to Split order, and only for people who may edit orders. It only shows when the split was undone.
Crew: several workers who start together
Some jobs need several people at the same time, for example a crew cleaning a large property. That is a Crew. A Crew is a split order where each part gets its own worker, and all the parts start at the order's start time.
How to make a crew
- Open the menu on the order in the calendar and choose Split order.
- Pick Number of parts. A split is 2 to 12 parts, and the order's minutes are divided between the parts.
- Turn on Crew. The text below explains that each part gets its own worker and starts together.
- Under Worker for part 1, Worker for part 2 and so on, pick who should take part. If you leave a part on To be planned, the planner chooses.
The customer's worker requirements and any lock apply to every part. If the order is locked to a worker, you pick a worker for every part yourself.
Crew needs Planning rules on your plan. On Starter, Crew is dimmed with a button to the subscription. You can still split the order without a Crew.
Clientflow refuses the crew if:
- the visit has no start time yet
- the same worker is chosen for two parts
- one of the workers is In training that day (see below)
- the customer's worker requirements exclude one of them
- one of them already has a visit fixed at that time
- one of them cannot be scheduled that day
Each refusal says why, and you can pick another worker.
Once the crew exists
The parts carry the badge Crew with their number, for example Crew 1/3. The workers see in their day plan who they work with. The customer sees one visit in the customer portal, with a line saying how many workers arrive together. The customer cannot move a crew visit in the portal.
- Change crew changes the number of parts and the workers. You find the button in the window that opens with Remove part on one of the parts, and in the Change crew window you save with Save changes. It does not work if a part has started or the customer has been told.
- If you move only one part, you get a yellow warning: The crew is split up. It says either that the crew is no longer together or that two parts have the same worker. Press Move the whole crew to move all the parts together.
What the planner does with a crew
The planner looks for a time when everyone can start together. If it cannot find one, it plans none of the parts. They end up under Unassigned orders with one of these reasons:
| Reason | What it means |
|---|---|
| Crew could not start together | A part could not be planned, or the parts could not start at the same time. The description names the part and why. |
| Crew: no shared start | Only some of the workers can start at the same time. The description says how many. |
| Crew: locked start times differ | Locked or notified parts have different start times. |
Live replanning (Automatically adjust the rest of the day) keeps a crew together.
In training
A new worker can ride with an experienced colleague for a while. The new worker is then In training, and the colleague is the Mentor. While the period lasts, the new worker gets no orders of their own in planning. They ride with the mentor and work on the mentor's orders.
How to put a worker in training
- Go to Settings → Workers and open the worker. This works for workers with the role Field worker, and only for a worker who has already been created.
- On the Basic tab, find the card In training.
- Pick the Mentor, the First day and, if you like, the Last day (optional). If you leave it empty, the period runs Until it is ended.
- Press Add period.
Under Periods you see them all with the status Planned, Running or Ended. You can take away a planned period with Remove. A period that is running you end with End training.
A few rules apply: the dates cannot be in the past, a period can only be ended earlier and not extended, two periods for the same worker cannot overlap, and the mentor cannot be in training themselves or be the worker.
If the worker is on piece rate or commission, Clientflow warns you that they earn no piece rate or commission on the mentor's orders. Consider another pay type for the period.
What do the worker and the office see?
- The day plan says In training with the mentor's name. If the mentor is off, it says that the mentor is off today and that the worker should contact the office.
- In the calendar the badge In training sits on the worker's day. If the mentor is off that day, the badge names the mentor and shows in a warning colour.
- If you move an order to a worker who is in training that day, you get a yellow warning that they ride with the mentor and have no capacity of their own.
- A worker who is in training cannot be picked for a part of a Crew that day.
Cleo planning
On Enterprise, Cleo also joins the planning. It is called Cleo planning, and it uses AI credits. If the company has switched AI off, it is not shown at all.
The week's planning summary: the switch
The summary has to be turned on before Cleo writes it. The switch is in Settings → Planning, at the top under Rules, in the card This week's planning summary.
- Open Settings → Planning.
- Turn on Show this week's planning summary. Under the switch it says Uses AI credits.
- Press Save changes at the bottom of the page.
The switch is off when you start, and the summary costs nothing until the office turns it on. It applies to the whole company. If you have picked a unit at the top of the page, you can see the switch but not change it. A line says it is changed under The company. On Starter and Professional you see a button to the subscription instead.
The week's planning summary in the calendar
Once the switch is on, Cleo writes a short summary in the calendar every week of the orders that could not be planned or were split, and why. It sits at the top of the calendar's side panel.
- Each point is a button. Press it and Cleo opens a new chat with a ready-made sentence you can send to Cleo. Nothing happens from the summary itself.
- At most 12 points are shown. If there are more, a line says how many are left, and you can ask Cleo about the rest.
- The arrow by the heading folds the summary up and open again. Use the cross (Hide the summary) when you are done with this week's. It then disappears for the whole company, not just for you.
- If there is no summary for the week, nothing is shown.
Ask Cleo about an order
Ask Cleo why a particular order was not planned, or why it was split. Cleo can name the planning rule or Competence that stood in the way. Administrators and office staff can ask.
To read more about Cleo, see AI features.
Which plan do I need?
| Starter | Professional | Enterprise | |
|---|---|---|---|
| Planning rules, including Prefer | — | Included | Included |
| Competences in planning | — | Included | Included |
| Keep parts together (split orders) | — | Included | Included |
| Automatic splitting (the planner splits large orders) | — | Included | Included |
| Crew (split orders with several workers) | — | Included | Included |
| In training | — | Included | Included |
| Cleo planning (uses AI credits) | — | — | Included |
On Starter the examples are dimmed with a Go to subscription button. If you press New rule, you get a message saying it needs a different plan, also with Go to subscription. The Split orders block is dimmed with Go to subscription too, for both Keep parts together and Automatic splitting. Splitting an order with Split order works on every plan, and so do a unit's own planning settings.
If you move to a smaller plan
Your rules stay, and you can still see them. But the planner does not use them, and they cannot be changed. The block says so itself: Your subscription no longer includes planning rules.
The same goes for Keep parts together: your choice is saved, but the planner places the parts independently. The Split orders block shows Keep parts together is not in use, and you can only pick Off.
The same goes for Automatic splitting: the settings are saved, but the planner no longer splits orders. Orders that are too big stay unplanned. The card says Automatic splitting is not in use, and you can only switch it off. The numbers are locked.
The same goes for Crew and In training. Your crews and periods are saved, but the planner does not use them. The In training card says so, and you can still view and end the periods. Crews you can view and remove.
If you upgrade again, the rules, Keep parts together, Automatic splitting, Crew and In training work as they did.
See the prices on the pricing page.
If something goes wrong
| Problem | Solution |
|---|---|
| A rule is not followed | Use Test an order. If the rule shows Gives way, it says why. If it shows Does not apply, the order does not match the conditions. |
| The rule is switched off | Check the switch on the rule and press Save changes. |
| Two rules say different things | The one higher up wins. Move the one that should win up. |
| An order sits under Do not plan automatically, but no rule says so | A rule about workers or time has ruled out every option. The description and Test an order show which one. |
| A locked order does not follow the rule | The rule wants to change something the lock keeps, such as the worker or the time. Then the rule gives way. Unlock the order if the rule should apply. |
| New rule shows a message with Go to subscription | Planning rules need Professional or Enterprise. |
| A Prefer rule is not followed | It is meant to be able to give way. See under the rule whether it was followed in the latest planning, and use Test an order to see what is in the way. If the rule must always be followed, set Strength to Must. |
| I got no warning when I moved an order | The warning only comes if the move breaks a Must rule. A Prefer rule does not warn. |
| The parts of a split order are not kept together | Check that Keep parts together under Split orders is not set to Off, and that the parts are not locked. The planner never moves locked parts. |
| A large order is not split automatically | Check that Split large orders automatically is switched on and saved, and that the card is not on Trial run. It only runs when a whole week is planned and in the nightly optimization, not when you re-plan a single day. A locked order, one in progress, or one where you undid an automatic split is not split. Press Allow automatic splitting again in the order if you undid it. |
| A large order is under Unassigned orders with the reason Cannot be split within the limits | The order would need more parts than Most parts, or the parts would be shorter than Shortest part (minutes). Change the limits under Automatic splitting, or split the order yourself with Split order. |
| A large order is under Unassigned orders with the reason No room, even split, One worker, too little time or Not split automatically | The workers do not have enough time this week even with the order split, or it was not split. The description says why. Free up time, allow more workers, or split the order yourself. |
| Every part of a split order is under Unassigned orders | The parts could not be kept together the way you chose. Read the description under the reason Keep parts together or Too few worker-days, and consider As close as possible or Prefer. |
| The parts of a Crew are under Unassigned orders | The planner could not find a time when everyone can start together. Read the description under the reason, and check the workers' days, Competences and locks. You can also drag the parts into the calendar yourself. |
| A worker in training gets no orders of their own | That is intended. The worker rides with the mentor while the period lasts. End the period under Settings → Workers if it should stop. |
Related
- Competences: set up what the jobs require, and who has it.
- Calendar and route optimization: how to plan the week, and what the reasons under Unassigned orders mean.
- Units: a unit's own planning settings.